Japan
Pearl Bridge

Provided by Honshu Shikoku Bridge Expressway Company Limited
|
Customer needs
n In anchorage construction of long and massive bridge, shortening the construction period was a big issue n Required to place high quality concrete in the areas where the big steels bars were set up very thickly Our solution
n BASF provided Rehobuild SP8 series (PCE type) and Rhebuild SP 9 series (BNS type), which can improve the workability, flowability and slump retention property.
n Hence, the placing speed of concrete was improved from maximum 1300 cubic meters per day to 1900 cubic meters per day. The dense and high-quality concrete was also placed in the areas where big steel bars were set up thickly.
|
Rainbow Bridge

|
Customer needs
n For the large scale baseplate structure like the main base part of super suspension bridge.
Our solution
n Unique 'bagpipe' method of consturction devised with Masterflow 870 grout to fill the large gaps effectively and provide optimal contact without voids.
|
Looking for tailor-made solution? Contact us now! Japan